Orlando, Orange and Brevard Counties

Milestone Inspections in Orlando and Brevard County

This guide covers milestone inspections in Orlando for condo boards in Orange and Brevard counties, including the 30-year rule and the possible local 25-year trigger. It also explains phase one, phase two and the local questions to confirm.

What to Expect from Milestone Inspections in Orlando

For covered condo and co-op buildings, milestone inspections in Orlando follow Florida’s structural inspection law, with a statewide first-inspection baseline of 30 years and repeat inspections every 10 years. Confirm with the building department whether a local 25-year trigger applies and how to respond to an inspection notice.

The statewide law applies to buildings with three or more habitable stories that are subject, wholly or partly, to residential condominium or cooperative ownership. It excludes single-family, two-family, three-family and four-family dwellings with three or fewer habitable stories above ground.

The City of Orlando page describes a mandatory structural safety check for condo and co-op association buildings three stories or taller under s. 553.899, Florida Statutes. Confirm which building department handles your property rather than relying on its mailing address alone.

The first inspection is due by December 31 of the year the building reaches 30 years of age, based on its certificate of occupancy date. Inspections then recur every 10 years. Local circumstances, including proximity to salt water, may lead the local enforcement agency to require the first inspection at 25 years.

Buildings that reached 30 before July 1, 2022 were due before December 31, 2024. Buildings reaching 30 between July 1, 2022 and December 31, 2024 were due before December 31, 2025. Check the association’s records for completed inspections, notices and any approved extensions.

Do not assume a reference to 40-year recertification answers your milestone questions. Ask the building department whether any separate local program applies, and consult the 40-year recertification repair guide when planning related work. For a broader overview, see milestone inspections in Florida.

Concrete balcony edge reviewed during milestone inspections in Orlando and Brevard County

Inland Orange County vs Coastal Brevard County

The same state law applies, but local enforcement can affect the first inspection’s timing. This table shows the statewide baseline, not a verified local schedule for either county.

Area or building ageStatewide timingWhat to confirm
Orlando and Orange County30 years, then every 10 years; a local 25-year trigger may applyAsk the building department about the applicable trigger, notice and submission process.
Brevard County near salt water30-year baseline; the local agency may require 25 yearsBrevard is coastal. Ask whether local environmental conditions trigger an earlier inspection.
Statewide baselineBy December 31 of the year the building reaches 30, then every 10 yearsUse the certificate of occupancy date and review the local agency’s notice.
Reached 30 before July 1, 2022Due before December 31, 2024Check prior notices, reports and any approved extension.
Reached 30 between July 1, 2022 and December 31, 2024Due before December 31, 2025Confirm the inspection’s status with the building department.

What the Inspection Covers

A milestone inspection is a structural review with two possible phases. It should not be treated as a substitute for a defined repair design scope.

Phase One

A Florida-licensed architect or engineer visually examines habitable and non-habitable areas, including major structural components. The result is a qualitative assessment. Phase two is not required if there are no signs of substantial structural deterioration.

Phase Two

Phase two is required when phase one finds substantial structural deterioration. It may involve destructive or non-destructive testing. The phase two guide explains this part of the inspection process.

Substantial Structural Deterioration

Surface imperfections such as cracks, sagging, leaks or peeling finishes are excluded unless the engineer or architect determines they indicate substantial structural deterioration. Appearance alone does not settle that question.

Why Surface Issues Still Matter

Share observed changes and available repair records with the inspector. Avoid dismissing a visible condition as cosmetic before professional review. The engineer or architect evaluates what those observations mean for the structure.

Who Performs the Work

Inspections are performed by a Florida-licensed architect or engineer. A team may be used, with reports signed and sealed by the responsible qualified professional. Ask who will be responsible for the assessment and report.

How the Process Moves from Notice to Repairs

The local enforcement agency’s notice starts a specific completion period for phase one. Keep inspection scheduling, report delivery and repair planning visible to the board throughout the process.

Step 01

Review the Notice

The local enforcement agency sends written notice. Phase one must be completed within 180 days of that notice. Keep the notice with the building records and identify who will coordinate the association’s response.

01

Step 02

Arrange Phase One

The engineer or architect completes the visual examination and provides a qualitative assessment. Discuss access to habitable and non-habitable areas before the visit. Keep existing engineering reports available for review.

02

Step 03

Address a Phase Two Finding

If the assessment identifies substantial structural deterioration, discuss the required phase two scope with the professional. Ask what testing may be needed and how access will be arranged. Do not treat testing as a guarantee of a particular finding.

03

Step 04

Track the Report and Repair Deadline

Repairs for substantial structural deterioration found in a phase two report must begin within 365 days after the local enforcement agency receives the report. This is a deadline to commence repairs, not a stated completion deadline. Confirm the agency’s receipt date.

04

Step 05

Discuss an Extension When Needed

The local enforcement agency may extend the inspection deadline for good cause. Owners must have a contract with an engineer or architect, and the inspection must be unable to finish in time. An extension is not automatic; discuss the request with the agency.

05

Step 06

Engineering Scope

Paul Edwards Pineda, PE, a Florida-licensed Registered Structural Engineer with 22 years of experience, performs milestone inspections, SIRS, 40/50-year recertification, concrete restoration engineering and special inspections. Readers can call 305-890-6333 to discuss their building. Ask for a scope that distinguishes inspection work from any later repair engineering.

06

Board Checklist Before You Hire

Organize the building records before discussing the inspection scope. Clear records help the board explain what is known, what is missing and what needs confirmation.

What the State Report Says About Central Florida

OPPAGA report 26-04 (2026) and ClickOrlando coverage dated July 31, 2026 reported 8,736 phase one inspections and 1,575 phase two inspections. Those totals cover 2024 and 2025 combined. The reporting also noted 1,587 extensions of initial deadlines.

Orange and Osceola counties were among areas with unsafe condos in the report. That finding does not establish the condition of an individual Orlando or Brevard building. Its condition needs to be evaluated through the inspection process.

The extension total does not mean an association will receive more time when it asks. The local enforcement agency decides whether good cause supports an extension under the statutory conditions. Keep the engineering contract and scheduling information available for that discussion.

For Central Florida boards, the practical response is to check the notice file, building-age records and inspection status. If no notice is on file, contact the building department rather than assuming no action is needed. Keep the department’s response with the association’s records.

Milestone Law vs 40-Year Recertification Searches

A service name is not enough to determine a building’s legal obligations. For covered residential condominium and cooperative buildings, start with the statewide milestone law. Ask the building department whether any separate local recertification program also applies.

If the association is considering SIRS alongside its milestone inspection, ask for the proposed deliverables for each service. Keep the scopes clear when reviewing proposals. Do not assume an inspection proposal includes every other engineering service the board may need.

Threshold building inspections involve a separate set of rules. A threshold building is greater than three stories or 50 feet in height. The definition also includes an assembly occupancy over 5,000 square feet with an occupant content over 500 persons.

During new construction, the enforcing agency requires structural inspections by a special inspector under a structural inspection plan. This also applies to repair or restoration when the structural system or structural loading is modified. The engineer or architect of record prepares the plan under s. 553.79(5), Florida Statutes.

The structural inspection plan must be submitted to and approved by the enforcing agency before the building permit is issued. The fee owner selects and pays the special inspector, who is responsible to the enforcement agency. These responsibilities should not be confused with the milestone assessment.

For repair planning, a concrete restoration engineer can review findings and help define the proposed engineering work. Clarify which services are included before requesting contractor bids. Confirm applicable local requirements with the building department as part of that planning.

Frequently Asked Questions

Yes, for buildings with three or more habitable stories that are subject, wholly or partly, to residential condominium or cooperative ownership. The law excludes single-family through four-family dwellings with three or fewer habitable stories above ground. Confirm your building’s eligibility with the building department.

No Brevard-specific trigger is verified here. State law allows the local enforcement agency to require inspection at 25 years because of local circumstances, including proximity to salt water. Ask the building department which trigger applies to your property.

It is a visual examination of habitable and non-habitable areas, including major structural components, by a licensed architect or engineer. The professional provides a qualitative assessment. That assessment determines whether findings require phase two.

It is required if phase one finds substantial structural deterioration. Testing may be destructive or non-destructive. Ask the responsible professional to explain the proposed investigation and what access it will need.

Repairs for substantial structural deterioration identified in the phase two report must commence within 365 days after the local enforcement agency receives that report. Track the receipt date with the agency. Do not confuse this start deadline with completing the repair work.

A Florida-licensed architect or engineer can perform it. The work may involve a team, but the responsible qualified professional signs and seals the reports. Confirm that responsibility when reviewing the proposed scope.