Milestone Inspections in Pinellas County and Hillsborough County
Pinellas County milestone inspections depend on which building department has authority over your address. This guide explains the local path, the Access Portal, and what engineers check near salt water.
- Licensed professional engineer in Florida
- Signed and sealed reports
Pinellas County Milestone Inspections: Who Handles Your Building
For Pinellas County milestone inspections, the county handles unincorporated areas and the municipalities listed below, while other cities use their own building departments. Match your address to the correct office, then confirm the inspection trigger and submission process.
Pinellas County is the building official for unincorporated Pinellas and these seven municipalities.
- Belleair Beach
- Belleair Bluffs
- Belleair Shore
- Indian Rocks Beach
- Oldsmar
- Safety Harbor
- Kenneth City
Other cities, such as St. Petersburg and Clearwater, use their own building departments. If you are not sure, check the Pinellas County condo milestone inspections page or call the building department.
The county page states a 30-year first inspection and every 10 years after. St. Petersburg has adopted a 25-year trigger for condo buildings 3 or more stories. Confirm that city rule with St. Petersburg before you plan your inspection.
For Hillsborough County and Tampa, no local specifics are verified here. Ask the building department whether a 25-year salt-water trigger applies to your building.
Pinellas County Ordinance 24-18 administers the local process. Contact Milestone@pinellas.gov with local process questions.
Paul Edwards Pineda, PE, a Florida-licensed Registered Structural Engineer with 22 years of experience, does the work for Milestone Inspections US, including phase one and phase two inspections. You can call 305-890-6333 to discuss your building.
Register on the Pinellas County Access Portal
The county page says owners register on the Pinellas County Access Portal. The engineer or architect then submits a sealed report. Use these steps to organize the work when the county is your building official.
Confirm the Local Office
Use the list above and the Pinellas County page. Call the building department if your address is unclear, rather than assuming a county mailing address determines jurisdiction.
01
Register on the Access Portal
Owners register on the Pinellas County Access Portal. Confirm account setup and any current submission instructions with the county before preparing the filing.
02
Hire the Right Professional
The law requires a Florida-licensed architect or engineer. A team may be used, with reports signed and sealed by the responsible qualified professional.
03
Complete Phase One
The local enforcement agency sends written notice. Phase one must be completed within 180 days of that notice. Arrange access with the inspecting professional.
04
Submit the Sealed Report
The engineer or architect submits the sealed report. A summary of material findings goes to the association, other owners, and the building official.
05
Watch for Phase Two
If phase one finds substantial structural deterioration, phase two is required. It may involve destructive or non-destructive testing. Ask the professional to explain the proposed investigation.
06
What Engineers Check on Waterfront Buildings
Gulf and bay salt air can affect concrete and steel over time. These are typical inspection items, not findings about any specific building. The inspection determines what observed conditions mean.
Balcony Edges
Salt air and rain can contribute to deterioration around balcony edges and rail connections. Engineers look for cracking, spalling, and exposed steel.
Parking Garages
Garage slabs and columns can be exposed to moisture and coastal air. Visual examination helps the engineer assess visible conditions and determine whether further investigation is needed.
Exposed Slab Edges
The engineer checks exposed edges for concrete loss and signs of corrosion. Photographs supplied by owners can help identify areas to examine, but they do not replace inspection.
Major Structural Components
Phase one includes major structural components and provides a qualitative assessment. Ask the inspecting professional which areas need access before arranging the site visit.
Non-Habitable Areas
Phase one covers habitable and non-habitable areas. Identify locked or restricted spaces ahead of the visit so the professional can discuss access needs with management.
Surface Imperfections
Cracks, sagging, leaks, and peeling finishes are not automatically substantial structural deterioration. The engineer decides whether they signal it. Appearance alone does not establish the finding.
Concrete Spalling in Florida Condos
Balcony edges and exposed slab edges can show concrete spalling in Florida condos. The engineer evaluates its significance rather than treating every damaged finish as a phase two trigger.
Pinellas, St. Petersburg, Clearwater, Hillsborough and Tampa
Local control changes by address. Use this table to find the right starting point, then confirm the trigger with the building department. Do not apply another jurisdiction’s process to your building.
| Area | Who handles it | Trigger to confirm | Where to start |
|---|---|---|---|
| Unincorporated Pinellas and 7 municipalities | Pinellas County is the building official | 30 years, then every 10 years per county page | Pinellas County Access Portal |
| St. Petersburg | City building department | 25 years for condo buildings 3 or more stories, confirm with city | City of St. Petersburg building department |
| Clearwater | City building department | Confirm with city | City of Clearwater building department |
| Hillsborough County | Confirm the responsible building department for your address | Confirm local trigger, including any 25-year salt-water rule | Hillsborough County building department |
| Tampa | Confirm with the city building department | Confirm local trigger, including any 25-year salt-water rule | City of Tampa building department |
Phase One and Phase Two: What the Law Requires
Phase one is a visual examination. A licensed architect or engineer examines habitable and non-habitable areas, including major structural components, and gives a qualitative assessment. If there are no signs of substantial structural deterioration, phase two is not required.
Phase two is required if phase one finds substantial structural deterioration. It may involve destructive or non-destructive testing. Our phase two guide explains testing in plain English.
Surface imperfections such as cracks, sagging, leaks, and peeling finishes are excluded from substantial structural deterioration unless the engineer or architect determines they signal it. A board should not classify a condition from photographs or appearance alone.
Threshold buildings follow a different set of rules during new construction or repairs that modify the structural system or structural loading. A threshold building is greater than three stories or 50 feet in height. It can also be an assembly occupancy over 5,000 square feet with an occupant content over 500 persons.
For the applicable threshold work, the enforcing agency requires a special inspector under a structural inspection plan prepared by the engineer or architect of record. That plan must be submitted to and approved by the agency before the building permit is issued. See s. 553.71(12) and s. 553.79(5), Florida Statutes.
The fee owner selects and pays the special inspector, who is responsible to the enforcement agency. The special inspector does not replace the building official, architect, or engineer of record. The contractor’s obligations remain in place.
The milestone inspections in Florida requirements apply to buildings at least three habitable stories tall that are subject wholly or partly to residential condominium or cooperative ownership. The law excludes single-family, two-family, three-family, and four-family dwellings with three or fewer habitable stories above ground. See s. 553.899, Florida Statutes.
Milestone Inspection Checklist for Condo Boards
Use this checklist to prepare for the local process. Confirm all dates and local rules with the building department. Keep the notice, inspection contract, reports, and agency correspondence together for board review.
- Confirm the building's habitable story count and ownership type with the inspecting professional. Review the dwelling exclusions before assuming the law applies.
- Locate the certificate of occupancy date used to establish building age. Ask the building department how to resolve missing or unclear records.
- Read the written notice and record the phase one deadline. Share the notice with the professional preparing the inspection.
- Ask whether a 25-year local trigger applies. Proximity to salt water can be a circumstance supporting an earlier requirement.
- Register on the Pinellas County Access Portal if Pinellas County is your building official. Confirm current filing instructions before submission.
- Hire a Florida-licensed architect or engineer. Discuss the inspection scope, access needs, and responsibility for the signed and sealed report.
- Gather available structural plans, prior inspection reports, and repair records. Ask the professional which materials would help the review.
- Plan for possible phase two testing without assuming it will be needed. The phase one findings determine whether phase two is required.
- If phase two identifies substantial structural deterioration, discuss repair planning with the engineer and building department. Track the date the agency receives the report.
- Keep owners informed through the summary of material findings. Preserve the report separately so the summary does not replace the technical record.
- Coordinate records with your structural integrity reserve study if your association has one. Treat inspection findings and reserve planning as separate tasks that may inform each other.
Deadlines, Extensions, and Repair Timeline
Buildings that reached 30 before July 1, 2022 were due before December 31, 2024. Buildings reaching 30 between July 1, 2022 and December 31, 2024 were due before December 31, 2025.
The general first-inspection deadline is December 31 of the year the building reaches 30 years of age, followed by inspections every 10 years. The local enforcement agency may require an inspection at 25 years where local circumstances, including proximity to salt water, call for it.
Phase one must be completed within 180 days of the agency’s written notice. An inspection contract alone does not establish an extension, so ask the agency about its decision and keep the correspondence.
The local enforcement agency may extend the deadline for good cause if owners have a contract with an engineer or architect and the inspection cannot be completed in time. Do not assume a requested extension has been granted.
Repairs for substantial structural deterioration found in a phase two report must commence within 365 days after the local enforcement agency receives the report. This is a deadline to begin repairs, not a promise that repairs will be completed within that period.
Ask the engineer to explain which findings need repair planning and what additional investigation may be needed. Keep inspection, design, permitting, and construction tasks distinct when discussing the work with owners.
Statewide, OPPAGA report 26-04 reports 8,736 phase one and 1,575 phase two inspections completed for 2024 and 2025 combined. It also reports 1,587 extensions of initial deadlines. These statewide figures do not establish availability or extension eligibility for your building.
Frequently Asked Questions
Clearwater uses its own building department. Confirm the trigger and process with the city. Pinellas County handles unincorporated Pinellas and the seven municipalities listed above.
St. Petersburg has adopted a 25-year trigger for condo buildings 3 or more stories. Confirm that city rule with St. Petersburg.
Phase one is a visual examination of habitable and non-habitable areas, including major structural components. Phase two is required if phase one finds substantial structural deterioration and may involve testing.
Phase one must be completed within 180 days of the local enforcement agency’s written notice. An extension may be granted for good cause when owners have an engineer or architect contract and the inspection cannot be completed in time.
Repairs for substantial structural deterioration found in a phase two report must commence within 365 days after the local enforcement agency receives the report. Confirm receipt and discuss the repair process with the agency.
A Florida-licensed architect or engineer performs the inspection. A team may be used, with reports signed and sealed by the responsible qualified professional. Ask who will be responsible for your report when reviewing the proposed scope.